project by project

Since 2010, YADAN SM Ltd have delivered mining, civil, earthworks and agriculture works across gold mines in Ghana — for Perseus Mining, AngloGold Ashanti, Golden Star & Asanko Gold. Our longest engagement, at Perseus's Edikan Mine, has run continuously since 2015.

Track Record

Mining

Tailings Operations

2022–PRESENT

Perseus Mining, Edikan — TSF Embankment Raising

Raising and maintaining embankments to full safety and environmental compliance.

2020

AngloGold Ashanti, Obuasi — Three New Tailings Ponds

Delivered in JV with WBHO and Quantum LLC.

2020

AngloGold Ashanti, Obuasi — Tailings Dam Reinforcement

Engaged by Ramoth Co Ltd.

2018–2021

Golden Star, Bogoso & Wassa — Tailings Dam Construction

Three years with Haakema Ltd, plus mining, rehandling and haulage.

Mining Operations

2021

Asanko Gold — Mining & Hauling

Supporting the mining department with Rocksure International.

2019

Perseus Mining, Edikan — Excavation & Haulage

Engaged by NewGift Ventures.

2020

Yellow Power Ghana — Fleet Deployment

A significant portion of our fleet leased for open-pit operations.

2010

Golden Star, Bogoso — Mining & Pit Backfilling

Our first mine contract, with Erdmac Limited.

Load, Haul & Plant Feed

PRESENT

Perseus Mining, Edikan — ROM Pad Feeding

Oxide run-of-mine feeding under Rocksure International.

PRESENT

Perseus Mining, Edikan — Crushed Ore Stockpile

Ore transfer and blending for consistent plant feed.

2019

Perseus Mining, Edikan — Heap Leach Handling

Loading points to ROM Pad, with Maxkwei Co Ltd.

2018

AngloGold Ashanti — Ajopa Pit Ore Haulage

Pit to ROM Pad, with Maxmass Ltd.

2015–PRESENT

Perseus Mining, Edikan — Haulage

Ore transfer to the processing plants, with Rocksure International.

2014

Endeavour Mining, Nzema — Haulage

With Hawkrad JOD and Justmoh Mining Services.

Track Record

Roads & Civil

2024

Perseus Mining — 12km Access Road

Drainage, swamp-area filling and road preparation, with Erdmac Limited.

2021

Asanko Gold — Civil Works

Road preparation, drainage creation and maintenance, with Rocksure International.

2019

Perseus Mining, Edikan — Genser Energy Power Station

Power distribution station built inside a live mine.

2015–PRESENT

Perseus Mining, Edikan — Haul Road Maintenance

Keeping ore movement uninterrupted.

2010

Golden Star, Bogoso — Civil Works

Delivered alongside mining operations with Erdmac Limited.

Track Record

Agriculture

2011

MiDA — Torgorme Irrigation Dam

Built with Erdmac Limited, serving small-scale farm holdings in the Volta Region.

2018

Quantum LLC — Volta Region Irrigation

Delivered concurrently with our mining haulage commitments.